Repsa   Repsa 
Home
Mail
20 de September de 2017
Lines
News
Case History
Panamerican Energy
1/2

Company: Panamerican Energy (Área Acambuco)
Work: 3” 2500 psi Yacimiento San Pedrito
Application: Inyección
Characteristics: Injection of excess water of treatment plant located in Piquirenda up to sump well in  San Pedrito deposit.
Laying length: 9000 mts
Work temperature: 131 ºF
Work pressure: 130 kg/cm2
Comments: Installation in operation since April 2002

© 2011 All rights reserved