Repsa   Repsa 
Home
Mail
20 de November de 2017
Lines
News
Case History
Vintage Oil Company
1/1

Company: Vintage Oil Company
Work: 10” 500 psi Yacimiento Cañadón Seco
Application: Gas pipeline
Characteristicss: Gas transport from Cañadón Seco (Vintage) plant to El Huemul (TGS) plant
Laying lenght: 40,000 m
Service pressure: 30kg/cm2
Tubería instalada en zona de mallines anegados, donde hubo que recurrir al uso de anclajes para evitar la flotación de la línea.Pipeline installed at flooded meadows (“mallines”), where anchorage was necessary to avoid the flotation of the line.

Commentss: Installation in operation since March 2001

© 2011 All rights reserved