Repsa   Repsa 
Home
Mail
20 de November de 2017
Lines
News
Case History
Pluspetrol E. y P.
1/3

Company: Pluspetrol E. y P.
Work
: : Installation ERFV 3” 500 psi tubes area. Bermejo River cross, Bolivia – Argentina
Application
: Stabilized oil/gasoline conduction (70/30)
Characteristics
: Pipeline suspended from a steel cable Ø 19mm with clamps.
Service load
: 8,000 Kg
Service pressure
: 10 kg/cm2
Volume
: 120m3/día
Lenght
: 276mts.
Difference between supports: 16,5 mts.
Comments: Installation in operation since October 1991

© 2011 All rights reserved